April 15, 2017

[<<Prev]                                                                                                                 [Next>>]

I match drilled the F-705G angle to the F-705F channel. The angle was located laterally by dropping a drill bit through the angle and slot channel. Cleco clamps were used to keep the angle butted up against the two channel faces.

I countersunk the holes on the F-705L shim.

On the F-605C doubler, one of the holes has to be countersunk.

Lastly, I got the seat ribs clecoed to the F-704 center bulkhead.

 

[<<Prev]                                                                                                                 [Next>>]