I finished riveting the doublers to the aft spar. 
 
 
Now that the left spar is done, I got to work on the right spar.
I match drilled the tie-down bar.

After drilling and priming, the tie-down bar and spacers were riveted together.
 
I primed the right spar doubler components and the top flange of the main wing spar. 
