February 24, 2019 [<<Prev] [Next>>] I set the rivets between the F-705 Bulkhead and the F-787 Stiffener Web. When I had originally riveted the F-728B Angle to the F-728A Channel, I wasn’t able to rivet the lower ~6 rivets. I got those set today. [<<Prev] [Next>>]