It looks like Vans never sent me the smaller nut plates that hole the trim plate to the left elevator–I need to shoot them an email.
I started working on the rear spars today.
I formed the doublers that are part of the elevator service bulletin.
I match drilled the doublers/nut plates to the rear spars.
Match drilled the outside rib components and deburred/fluted the ribs.