May 26, 2014

It looks like Vans never sent me the smaller nut plates that hole the trim plate to the left elevator–I need to shoot them an email.

I started working on the rear spars today.

I formed the doublers that are part of the elevator service bulletin.

I match drilled the doublers/nut plates to the rear spars.

Match drilled the outside rib components and deburred/fluted the ribs.