June 3, 2014

I received new vise grip dimpler.

Finished the rudder rib.

I match drilled the ribs to the elevator spar.
IMG_4195

IMG_4198

The lead weight was drilled out.
IMG_4204

Installed the inner rib.
IMG_4208