Used the touch up primer to clean up the top spar stiffener.
Riveted the stiffeners, and doublers to the front spars
The rivets initially installed looked sloppy so I drilled them out and installed them on the opposite side.
The hole for the trim cable was added.
This needs to be drilled to 5/8 dia. A new unibit was ordered from McMaster.