April 17, 2017

[<<Prev]                                                                                                                 [Next>>]

This was a pretty fun day for the fuselage. After banging out the F-705 bulkhead (shown in the “bulkhead” section), I got the F-704 and F-705 bulkheads clecoed together.

The bottom skin was clecoed to the ribs/bulkheads.

The F-XXX rib has to be trimmed to fit between the bulkheads. I clamped the rib in place and marked the location. 

The cut on the F-XXX rib turned out perfect.

It was totally unnecessary to line up the center section with the aft section, but I thought it looked really cool. This fuselage is really starting to look awesome!

[<<Prev]                                                                                                                 [Next>>]