I used my right angle drill the floor stiffeners to the firewall and F-704 bulkhead brackets.
![]()
I moved on to the framing of the baggage area. The first thing I did was cut the 5/8 diameter rudder cable holes in the F-724 bulkhead. Based on a quick inspection against a right angle, it looks like the bulkhead flange does not need to be fluted.
![]()
It’s really awesome to feel like I’m on the home stretch for all this fuselage preparation work. I should be able to begin the disassembly in 2-3 more sessions.