I spent this session match drilling the fuselage. To get started, I drilled the F-720 Armrest to the F-705 Bulkhead.
The Armrest was drilled to the F-704 Bulkhead.
This image shows all the rivet locations that have been match drilled. The green tape indicates all the areas I drilled today.