I worked on getting the left gear mount drilled to the fuselage. After bolting up the mount to the F-704 Bulkhead, I got the gear clamped up to the side wall of the fuselage. I was then able to drilled the gear to the longeron. I’m just drilling the holes to #30 for now.
Here’s a picture of the weldment from the inside. I got the forward strut drilled to the fuselage.