I knocked out some rivets on the right side of the fuselage. Between a particularly brutal work schedule and being out of town, I’ve gotten very little airplane time in recently. I was in the hangar for only 2 hours, but I made some nice progress.
I knocked out nearly all the rivets along the center side of the fuselage.
The rivets on the right two rows of the bottom skin were set. I also set the right side rivets that mate the bottom skins to the F-704 bulkhead.
About half the rivets the join the aft and center bottom skins were installed.
Lastly, I installed the rivets along the outer seat rib.
I’ve been really excited to get to the point where I can roll the canoe. At this point, I’m probably 2-3 more sessions away!