I got a solid Saturday in at the hangar. The day was mostly spent doing prep work for the interior.
I started match drilling the nutplates along the outer set ribs. I used 1 nutplate/screw as the tool to drill at holes.
The rest of the day was spent priming parts. Here are the baggage bulkheads, seat floors, firewall gussets, and baggage sidewalls.