June 21, 2015

[<<Prev]                                                                                                                 [Next>>]

I sanded and deburred the right tank stiffeners. IMG_8377

The stiffeners were clecoed to the right tank skin.
IMG_8379

I deburred the right tank ribs. The flanges of the tank ribs were fluted and bent to 90.
IMG_8382

I drilled the spar-side of the Z-brackets.
IMG_8383

[<<Prev]                                                                                                                 [Next>>]