March 4, 2019

[<<Prev]                                                                                                                 [Next>>]

I did a small amount of work on the F-751 and F-652 Baggage Bulkheads. I basically just drilled various nutplate holes on both bulkheads and the UHWM Wear Block holes. These parts are ready for deburring and priming.

[<<Prev]                                                                                                                 [Next>>]