September 1, 2019 [<<Prev] [Next>>] I temp installed the F-741A Tunnel Supports so the top plate could be match drilled. Here’s the F-741B Top Plate drilled and clecoed. I finished up the day by riveting in the crotch strap brackets. Looking good. [<<Prev] [Next>>]