I started the day by bolting the Z-brackets to the right spar.

I got the fuel tank skin and leading edge skin lined-up. I drilled the inboard Z-bracket.

The skin was removed to the and the other Z-brackets were drilled.

I got the fuel tank ribs installed and matched drilled.

I re-installed the skin with clecoes. Everything is aligned and looking very good.


