December 6, 2014

[<<Prev]                                                                                                                 [Next>>]

My main job for the day was to finish prepping the right wing ribs. As I’ve done many times, the ribs were deburred, fluted, straightened, and sanded. IMG_6594

Besides match drilling, the ribs are ready to go.
IMG_6598

I clecoed the right wing skeleton. Looking good!
IMG_6606

 

I bought the upgraded fuel caps from Vans. These quality of these caps is significantly better compared to the stock caps. 
IMG_6608

[<<Prev]                                                                                                                 [Next>>]