December 7, 2014

[<<Prev]                                                                                                                 [Next>>]

I started off the day by match drilling the ribs to the main and aft spars.
IMG_6614_2

I deburred the match drilled holes and did a final inspection before getting the ribs ready for priming.IMG_6615_2

The ribs have all been primed. The blue tape was used to mark each rib.
IMG_6620

[<<Prev]                                                                                                                 [Next>>]