February 25, 2019

[<<Prev]                                                                                                                 [Next>>]

Since there’s very few small jobs to do on the fuselage area, I decided to jump to a firewall forward portion of the project. I got the brake reservoir holes drilled.

I centered the reservoir around rivet shown below. Determining the hole locations was mostly accomplished with calipers.

This image shows the brake reservoir being temporarily installed.

[<<Prev]                                                                                                                 [Next>>]